Marathon PGM Corporation today announced the second set of results from the 2009 campaign at the Marathon PGM-Cu Project.
The highlight of the drill project include a hole that intersected 67.7 metres of 0.47 grams per tonne (g/t) of gold and 0.25 per cent of copper in the new zone located within the pit boundary. Drill holes tested the new 4800 zone of mineralization on the eastern margin of the pit boundary.
Marathon has designed the 2009 drilling campaign to improve drill density, and resource classifications.