Drilling results from Sudbury-based Houston Lake Mining Inc.'s Dubenski Property near Kenora have extended gold mineralization to 365 metres.
Results from five additional holes of an 18-hole, 2,000-metre Phase III diamond drill program include a 15.5-metre intercept grading 1.42 grams per tonne (g/t) gold. Two other drill holes feature 28 metres grading 1.58 g/t, and 31.6 metres grading 1.4 g/t.
Since Phase I drilling, the company has extended gold mineralization at the property by a factor of six. The mineralization remains open along strike and to depth.
Houston Lake's Dubenski Property is just one of eight contiguous properties which make up the company's 1,674-acre West Cedartree Gold Project.